• Home
  • About
  • Services
    • Demolition Services
    • Enabling Works
    • Demolition Advice
  • Projects
    • Beresford Street Woolwich
    • North Middlesex Hospital
    • Ghyllgrove Nursing Home
    • Pilgrim Hospital
    • Oaklands College
    • 8-10 Great George Street
    • Maycroft Care Home
    • Quarry Wood
    • Paddock Road Depot
    • Armfield House
    • Rooks Heath School
    • Heal & Son
  • Contact
  • More
    • Home
    • About
    • Services
      • Demolition Services
      • Enabling Works
      • Demolition Advice
    • Projects
      • Beresford Street Woolwich
      • North Middlesex Hospital
      • Ghyllgrove Nursing Home
      • Pilgrim Hospital
      • Oaklands College
      • 8-10 Great George Street
      • Maycroft Care Home
      • Quarry Wood
      • Paddock Road Depot
      • Armfield House
      • Rooks Heath School
      • Heal & Son
    • Contact
  • Home
  • About
  • Services
    • Demolition Services
    • Enabling Works
    • Demolition Advice
  • Projects
    • Beresford Street Woolwich
    • North Middlesex Hospital
    • Ghyllgrove Nursing Home
    • Pilgrim Hospital
    • Oaklands College
    • 8-10 Great George Street
    • Maycroft Care Home
    • Quarry Wood
    • Paddock Road Depot
    • Armfield House
    • Rooks Heath School
    • Heal & Son
  • Contact

Pilgrim Hospital, Boston

Services provided:

  • Internal soft strip and demolition back to shell of the 2nd, 3rd, and 4th floors of the maternity building
  • Demolition of all internal blockwork dividing walls
  • Removal of floor covering throughout
  • Removal of external glazing to 2nd, 3rd, and 4th floors

Scope of works:

This project consisted of the soft strip and demolition back to shell of the 2nd, 3rd, and 4th floors of the maternity building at Pilgrim Hospital, while working in collaboration with our asbestos removal contractor. 


The project was logistically challenging, operating within a live hospital environment directly above live floors of the maternity building, whereby it was imperative operations were not disturbed as a result of our works. The utilisation of an external hoist system optimised waste disposal, and enabled the separation between hospital activities and construction activities. 


Continued communication between all parties was key on this project to ensure the safe delivery of works.

  • Home
  • About
  • Contact

Info@beecroftdemolition.co.uk

Copyright © 2021 Beecroft Demolition Ltd - All Rights Reserved.

Powered by